The Lenovo X9 is a modernised ThinkPad at a mainstream price
The X9-14 drops the iconic red TrackPoint for a Mac-like haptic trackpad. I like it.
The X9-14 drops the iconic red TrackPoint for a Mac-like haptic trackpad. I like it.
Sophisticated hacking tools, hundreds of malware variants, and US$3 million in crypto payments tell a different story.
Stringent efficiency requirements and mandatory green power sources will define DC-CFA2.
Singapore faces severe constraints on land, power, and carbon. But it has a game plan.
The bug created a race condition where stale records triggered cleanup while updates were still happening.
Companies are betting they'll reach higher productivity eventually. Workers are paying the price now.
Design virtually and optimise power use - all before construction begins.
Equinix had no operational data centres in Malaysia at the start of 2024. Soon it'll have four.
20-hectare park is part of Singapore's push to become a green energy hub.
Unqualified workers relocated lithium-ion batteries without cutting power or following safety protocols.
Building above-average understanding is simpler than you think.
Malaysia's data centre boom was built on a decade of foundational work that's now paying off.
Events
Finding intruders quickly is vital in today's noisy networks.
Events
To narrow the gap between CII operators and state-sponsored attackers.
Enterprise
Including for users in Asia
Sustainability
Conditional approval for 1GW from Sarawak granted; will conduct study on second electricity interconnector to Johor.
Unfiltered
Quality posts should get more impressions. But the algorithm can't tell what's quality anymore.
Data Centres
Malaysia will surpass India, Australia, and Japan in data centre capacity by 2029. But challenges loom.
Data Centres
Petaling Jaya, Kuala Lumpur, and Johor Bahru affected by temporary shutdown of the Edra Melaka Power Plant.
Data Centres
The gigawatt-scale data centre will be in Visakhapatnam, far from India's established tech hubs.
Writing
Writing clarifies thoughts and unpacks ideas. That's why I write daily now.
Cyber Security
Seventeen-hour workdays with electric shocks and beatings.
Events
Liquid cooling only way forward as data centres move towards 1MW racks.
Events
And achieves up to 85% water recovery in Johor.